Launch Recite Me assistive technology
Exit site

Our developments

3899

Homes we've built since 2019

899

Homes in the pipeline

25

years till we're net zero

We don’t just have homes to rent at Yorkshire Housing, we build them too. We’ve got our own development team, our own unique house types and a focused development programme that plan to build 8,000 homes.

We build homes for rent, low-cost ownership and market sale. Our smart homes are more energy efficient and sustainable, and more affordable to live in. Our new homes are sold under the Space Homes brand, and we reinvest the profits into building more social and affordable homes across Yorkshire.

Buy a home
Aerial photo of our site at Spofforth running alongside the river

Our schemes in Yorkshire

Map key: red = live sites, blue = completed developments

Some of our current developments

Baycroft, Bridlington

  • Completion: Winter 2026
  • Contract value: Circa £10m
  • Homes: 54 homes, including affordable rent, rent to buy and shared ownership. One, two and three‑bed homes, plus two one‑bed bungalows
  • Contractor: Esh Group
  • Partners: DRESO, Whiteley Eaves
  • What makes this development different? Our first gas‑free development. Instead of gas boilers, these homes are being built with air source heat pumps, as well as solar panels, enhanced insulation, and timber frames.
A computer-generated image showing streets and new homes at Yorkshire Housing's Baycroft development in Bridlington.

St John's Park, Beverley

  • Completion: Summer 2027
  • Contract value: Circa £29m
  • Homes: 136 homes for social rent, rent to buy and shared ownership. Two, three and four‑bed homes
  • Contractor: Strata
  • Partners: Summers Inman, Clerk of Works Yorkshire, DRESO
  • What makes this development different? Our first development to be delivered under the new building regulations, using solar PV and electric vehicle charging to improve energy efficiency and support lower‑carbon living.
42

We're also working on...

  • Completion: 2026
  • Contract value: Circa £52m
  • Homes: 267 homes for open market sale, shared ownership, rent to buy and affordable rent. Two, three and four‑bed homes
  • Contractor: Equans
  • Partners: AA Projects and MHA Architects
  • What makes this development different? Our second largest development to date, delivering energy‑efficient, sustainable and affordable homes at scale.
  • Completion: Winter 2027
  • Contract value: Circa £12.5m
  • Homes: 58 homes, including affordable rent, social rent and shared ownership. Two, three and four‑bed homes
  • Contractor: Lindum
  • Partners: MDA Architects, Identity Consult, Whiteley Eaves
  • What makes this development different? Our second zero‑gas development, with all homes constructed using timber‑frames.
  • Completion: Autumn 2027
  • Contract value: Circa £10.5m
  • Homes: 58 homes, including shared ownership, rent to buy and social rent. Bungalows and a mix of single‑storey and two‑storey homes
  • Contractor: Hoober Urban Partnerships
  • Partners: Loroc Architects, Dart Engineering , Arcus Consulting Ltd and Whiteley Eaves.
  • What makes this development different? Our third gas‑free development, delivering 58 affordable homes using low‑carbon technology including air source heat pumps, solar panels, EV charging and high‑quality insulation.
  • Completion: Summer 2026
  • Contract value: Circa £23m
  • Homes: 113 homes, including rent to buy, shared ownership and affordable rent. Two, three and four‑bed homes
  • Contractor: Termrim Construction
  • Partners: Michael Dyson Associates, QAD
  • What makes this development different? A large development designed to support more sustainable living, with electric vehicle charging and solar PV installed on selected homes.
  • Completion: Summer 2026
  • Contract value: Circa £10m
  • Homes: 37 homes, including rent to buy, shared ownership and affordable rent. Two, three and four‑bed homes
  • Contractor: Jack Lunn
  • Partners: Savills, Clerk of Works Yorkshire and Arcus
  • What makes this development different?
  • Built on a regenerated brownfield site, the homes include electric vehicle charging and solar PV to support lower‑carbon living.

Sustainability

Sustainability is at the heart of how we build. Our homes are designed to meet Nationally Described Space Standards (NDSS), going beyond minimum requirements to provide high-quality, energy-efficient, well‑designed homes.

We also think about sustainability beyond the homes themselves, choosing sites with good public transport links and close to existing communities, so people can easily access the local services they need.

Our homes are built to be energy efficient, using a fabric‑first approach that helps keep heat in and energy use down. We’re also moving away from gas in our new homes wherever possible, supporting our journey to net zero by 2050 - and helping our customers manage the cost of living while enjoying warmer, more comfortable homes.

To find out more, visit our sustainability page.

Aerial view of the St Andrews Grange development, showing new red‑brick houses with solar panels and surrounding streets.
17 March 2026

50 new affordable homes completed in Armley, Leeds

An aerial photo showing construction underway at the zero-gas housing development.
27 August 2025

Our first zero-gas development gets underway in Bridlington

A drone image of affordable homes at the Bridgewell development in Spofforth with blue skies and countryside in the background.
09 July 2025

Bridgewell brings 72 affordable homes to North Yorkshire village

Hutton Bank Site 2
07 April 2025

Work restarts on affordable homes in Ripon

A row of multi-coloured terraced homes at the Climate Innovation District in Leeds.
17 January 2025

Yorkshire Housing delivers social homes at Climate Innovation District